Latest Projects
UCSD Mayer Hall
The Egyptian Lofts
zoom Marriott Del Mar Gateway
zoom UC Riverside Genomics
zoom El Camino College Humanities Complex
zoom UCLA Ronald Regan Medical Center
zoom Cortez Lofts
zoom SFSU Sutro Library
zoom 9378 Wilshire, Beverly Hills
zoom Quechan Hotel and Casino
zoom The Trails
zoom UCSD Student Housing DB
zoom Fashion Walk
zoom Promenada at Rainbow
zoom The Village At Morena Vista
zoom Naval Medical Center Parking Garage

 

Structuaral Concrete. An inspiration to the rest of the building.
UCSD Mayer Hall
  • 5-story CIP educational facility
  • Concrete footings, columns, slabs, decks and walls
  • 26 weeks duration


The Project:

UCSD's Mayer Hall is a five-story gem slated to open in 2008. The building will host 45,000 square feet of office, research, instructional and lab space, and will feature innovative architectural and design elements. Despite challenges involving logistics, materials and various design aspects of the building, the structural framework was completed on time and on budget - and to exacting construction standards.