Latest Projects
UCSD Mayer Hall
The Egyptian Lofts
zoom Marriott Del Mar Gateway
zoom UC Riverside Genomics
zoom El Camino College Humanities Complex
zoom UCLA Ronald Regan Medical Center
zoom Cortez Lofts
zoom SFSU Sutro Library
zoom 9378 Wilshire, Beverly Hills
zoom Quechan Hotel and Casino
zoom The Trails
zoom UCSD Student Housing DB
zoom Fashion Walk
zoom Promenada at Rainbow
zoom The Village At Morena Vista
zoom Naval Medical Center Parking Garage

 

Structuaral Concrete. An inspiration to the rest of the building.
The Egyptian Lofts
  • Two levels of subterranean parking with transfer slab
    and a seven-story CIP tower.
  • Eight months building duration


The Project:

Plans called for this seven-story cast-in-place condominium complex and subterranean parking structure to be built around the historical Egyptian Theater, an intricate Art Moderne cinema dating from the 1920's. Featuring floor-to-ceiling windows and 12-foot exposed concrete ceilings, the loft style condos required exceptional attention to detail and utmost quality control of the architectural concrete elements.