CHRIST LUTHERAN
PROJECT DELIVERY: CMC, Guaranteed Maximum Price
ARCHITECT: Studio E Architects
T.B. Penick was selected as the contractor based upon their reputation,
references and concrete capabilities. Christ Lutheran was built in
1954 and was in need of significant upgrades. Renovation included
opening up the interior spaces, increasing and improving access and
supplying more light for worship services. New doors were added, current
light fixtures were also updated and pews were refinished and shortened.
The project included the addition of a decorative "River of Life"
into the existing structural slab with stained concrete flooring flowing
from the altar down the main aisle and out the front door of the church.
- Previous - -
Next -
|
|